Data Center Map

              Manitoba Hydro Telecom


              » Index » Canada » Winnipeg » Manitoba Hydro Telecom

              Manitoba Hydro Telecom is located in the area Winnipeg, Canada, and the colocation data center is carrier neutral. The data center was last updated on 15-11-2016.


              Address:
              Manitoba Hydro Telecom
              R3P1A3 Winnipeg
              Manitoba, Canada

              » Request quote
              » Visit website

              Click here to find other data centers
              owned and operated by Manitoba Hydro Telecom.
              * For security reasons this data center does not want its exact location publicly available.
              Therefore the address above is not the exact location, but it is within 360 Portage Ave..


              Profile
              Tenants
              Connectivity
              Request quote
              Office space
              Rack Cabinets
              Dedicated Servers
              Suites
              Footprints
              Virtual Servers
              Cages
              Hosting of individual servers
              Remote Hands

              Profile


              With Manitoba Hydro Telecom (MHT) you can access a stable, robust, and scalable environment for hosting databases, application servers, and file servers to meet your IT needs. MHT leases cabinets (racks) to clients on a monthly basis to colocate equipment.

              The MHT fiber network includes connections to 151 Front St. in Toronto and The Westin Building (Seattle Internet Exchange) in Seattle. You can also connect your equipment to the majority of Manitoba using Transparent LAN Services.

              Features:
              - UPS backup, diesel generators, and standard commercial power.
              - Carrier-neutrality provides you access to major telecommunications carriers.
              - Comprehensive physical security, climate control, fire control, 24/7 monitoring and support.
              - Space and electrical power can be increased as needed.

              Space Available:

              1/4 locked cabinet 20 amp AC/UPS
              1/3 locked cabinet 20 amp AC/UPS
              1/2 locked cabinet 20 amp AC/UPS
              Full locked cabinet 20 amp AC/UPS


              Manitoba Hydro Telecom Pricing/Quotes


              If you are interested in receiving a quote for Manitoba Hydro Telecom, please try our free quote service.

              Copyright © Data Center Map - Sitemap
              Your guide to colocation data centers, managed hosting, cloud servers etc.
              公和我在浴室做好爽